Safer, higher-capacity panels for Davie homes — 100A up to 400A
Xlectrical replaces and upgrades electrical panels in Davie, from suburban neighborhoods, large-lot and equestrian properties, and busy commercial corridors. We handle the load calculation, permit, FPL coordination and inspection, with a written price before work begins.
Xlectrical provides electrical panel upgrade in Davie, FL. We are a licensed Florida electrical contractor (EC 13014052) based in Sunrise — Davie is just south of our Sunrise office — with written upfront pricing, permits handled and a 1-year Done-Right workmanship guarantee.
Hours: Mon–Fri 7am–10pm, Sat 8am–12pm, Sun 2pm–9:30pm · 24/7 emergency line · Rated 5.0 on Google (260+ reviews).
Why Davie homes upgrade their panels
Davie properties often need more than a standard house panel: barns, workshops, gates, pool equipment and long underground runs call for subpanels, meter upgrades and careful load planning. Typical homes we work on here include suburban neighborhoods, large-lot and equestrian properties, and busy commercial corridors.
100A to 200A — or up to 400A
A 200-amp service gives most Davie homes room for EV charging, modern AC, kitchen upgrades and pool equipment. Larger homes with pools, spas and two EVs may need 320 or 400 amps. We always start with a load calculation so the upgrade matches your real needs — not a one-size-fits-all number.
Permits and inspections in Davie
Panel and service upgrades in Davie are permitted through the Town of Davie Building Division. When the service or meter changes, we coordinate the disconnect and reconnect with FPL, then schedule the final inspection, and we follow your HOAs in planned neighborhoods rules for exterior work.
What it typically costs
Panel replacements generally run $1,600–$4,800, and 100A-to-200A service upgrades $2,600–$8,500, depending on the panel, the meter and how much wiring needs to change. You get a written price before any work starts — see our full price list.
How the upgrade works
On-site evaluation and load calculation.
Written estimate with the exact scope and price.
Permit filed with Town of Davie Building Division.
Installation day — power is off for part of the day; circuits are labeled and tested.
Final inspection and FPL reconnection if the service changed.
Based in Sunrise — Davie is just south of our Sunrise office
Written price before any work begins
Permits and inspections handled with Town of Davie Building Division
One-year Done-Right workmanship guarantee
Financing available through Housecall Pro
FAQ
Panel Upgrade in Davie: FAQ
How long does a panel upgrade take in Davie?
Most panel replacements are completed in one day once the permit is approved; service upgrades that involve the meter and FPL can take one to two days.
Do I need a 200-amp or 400-amp service?
A load calculation answers that. Most homes are well served by 200 amps; very large homes with pools, spas and multiple EVs may need 320–400 amps.
Who issues the permit in Davie?
Permits are issued by the Town of Davie Building Division. We file it, schedule the inspection and coordinate with FPL when required.
Do you work on barns, workshops and outbuildings?
Yes. We install and repair subpanels, underground feeders, lighting and outlets for barns, workshops, gates and other outbuildings on Davie properties.